Skill of Job Instruction - Finding Patterns in Standard Work

A common criticism of Lean and standard work is that it cannot be applied to non-repetitive situations. Over the years, prior to and after having learned about Job Instruction, I�ve always tried to understand the source of this criticism. Although not a complete explanation, nor meant to be revealing of the nature of non-repetitive systems, this short article is meant to convey what I have learned so far.

First, the disclaimer: I�m speaking of the purest sense of standard work routines, those that incorporate the concepts of takt time, standard wip levels and a defined work sequence. Anyone that applies what I say here to another scenario runs the risk of misinterpreting what is written here.

So, let�s look at a classic non-repetitive task in the modern age: a machine tender or the classic machine operator. Pick your product and process as desired. In this case, the operator�s job is to run several machines that perform an intermediate operation on a high volume product. The operator loads material, performs quality checks, fills out paperwork, cleans the area and monitors equipment status. Of these many tasks, there may be a dozen sub-tasks underneath. If we were asked to tally up all of the things this person does in one day, it would number in the hundreds of tasks. In general the person knows what to do and how to do it. Then the problems begin.

�Clearing jams on one day is less on the next. It seems like when things go wrong, all you do is fight with the machine to keep it running. There isn�t time for any of the other things management wants done like 5S and Kaizen. Some days are met with hours of downtime. Scrap is high one day, so sorting is longer than normal. The problems are worse today than they were yesterday, so more time is spent with the mechanic explaining the problems. The second shift operator was so frustrated that he left the area a mess, increasing my time in cleaning.

"Monitoring the equipment is pointless, because adjustments will be made and once that machine is running; there is no point in monitoring settings that work, right? They are only going to change once the machine goes down again anyway. How is a person supposed to get all of this done in one day? The lean guys are coming in and saying we need to standardize this job? It�s a different job everyday! The only thing that is standard about this job is that some days you win and some days you lose.�


Here we see a pretty typical attitude towards the suggestion that standardization is needed. How can we standardize something that changes every day? The problem here is that we have lost our sense of what the standard job operation should be. We think that part of the job is �trying to keep up� but that isn�t what the job really is. Therefore the response to standardization is that the job can�t be standardized. Why is this the response? What if the lean guys came in and said instead that, �we should seven people work on this job simultaneously and do this job anyway they want, so it will reduce the lead time in getting the tasks done.� What would the response be then?

The problem is that when we think of the word standardization we think of a definite sequence or pattern. Since we don�t know the standard job operation, than we certainly don�t see any patterns for standardization or aren�t readily willing to admit that a pattern may exist; we just can�t see it.

My experience in getting people to see this through sheer will and some slight nudging has been as expected; a dismal failure. However, it wasn�t until people started attending my Job Instruction sessions that I realized, people are beginning to see the patterns of work. When a person writes a Job Breakdown Sheet for say, monitoring the process settings for an area, they see a definite work pattern; that is, there is a certain way to do it. When they write down a JBS on how to do a quality check, they see a definite pattern. We can then ask, how often should this be done? Where should it be done? This leads us to see the pattern of so-called non-repetitive work, by systematically breaking down the job into its smaller task elements, we see the tasks as discrete, with certain periods of time to perform them in and in a repeatable sequence masked by stoppages, non-productive work and other disruptions that we normally refer to as �just part of the job.�

The trick then, is to use first understand the repetitive work tasks using Job Instruction. This helps us classify productive work from non-productive work. Once we see the two types in their respective categories, you will be tempted to use process kaizen to create the standardized work routines. This could be a mistake because if you do have excessive stoppages, then you should conduct equipment kaizen next. Then the process kaizen will establish your standard work routines. From there, you may repeat the process of observing the work, making improvements through manual, equipment and process kaizen and locking in the improvements through standardized work and Job Instruction.
Read more »»  

The Great Divide


What is the great divide between �the art of management� and �the science of management�? We get a clue in the December 10, 2007 issue of The New Yorker. In The Checklist, Atul Gawande explains how one doctor is radically changing medicine by improving the processes that doctors, nurses and specialists are engaged in everyday. For example, a checklist used in ICU reduced line infection rates from eleven percent to zero. Think zero defects in manufacturing. Part of a study done in ICUs found that an average of 178 procedures are completed on a patient. Inserting a line is only one of those steps. What else could go wrong?

Read the entire article and get it in the hands of others. It is compelling. It also helps quell the riot of that standard work stuff doesn�t work here mantra. If standard work can be effective in hospitals where an ICU team will face 1 over 32,000 possible combinations of procedures for every patient with on average of 178 steps for each combinations, then it can standard work will work for us in manufacturing.

This article reads like it was plucked from the newest lean manufacturing book. Take for example the quote from the subject of the article, Peter Pronovost,

�The fundamental problem with the quality of American medicine is that we�ve failed to view delivery of health care as a science. The tasks of medical science fall into three buckets. One is understanding disease biology. One is finding effective therapies. And one is insuring those therapies are delivered effectively. That third bucket has been almost totally ignored by research funders, government and academia. It�s viewed as the art of medicine. That�s a mistake, a huge mistake.�

How many people out there think that what they do is more art than science? The fact is, it just feels like an art when everything works well. We just don�t see the pattern of repeatability in what we do. Whether it is the nurse feeling for a vein, an artist feeling the correct brush stroke, an mechanic setting the right torque, or an operator lifting something safely, there is definite and correct technique that produces a unique result.

In management, how often have you heard that management is an art, not a science? Isn�t it time we put that old horse to rest? Is the great divide between art and science then the concept of process improvement thinking?
Read more »»  

Job Methods New Materials Update - TWI Service Website

I'm doing my spring cleaning in the winter! A couple of days ago, I announced the Job Relations materials update. There is also some Job Instruction for Healthcare. Hospitals need as much standardization improvement today as they did during the days of Gilbreth, Mogensen and others recognizing the need for standardization and simplification of healthcare work.

Today, visit the Job Methods page for insight behind Toyota's secrets to Kaizen, TWI! Dig deeper into the development of Job Methods and Kaizen by exploring archival documents retrieved from the U.S. Archives.
Read more »»  

Toyota Builds Inventory

Caution: rhetoric ahead.

A brief at the Detroit Free Press online says that Toyota and Honda, "may modify their just-in-time manufacturing system to avoid possible supplier bankruptcies affecting production."

"We are told inventory is a waste."

Some go as far as (foolishly) adopting a "zero inventory" policy.

"We have "learned" all this from Toyota."

"So, now they are building inventory? Why?"

"Isn't that anti-lean? I thought the kanban system was invincible?"

O.k., I got that out of my system. Thanks! One thing to keep in mind is that the kanban system is not a zero inventory system. It could be better classified as a "right-sized" inventory system. What is the right size inventory for a high demand market? What is the right quantity for a low demand market? What is the right demand for a market where your suppliers go bankrupt?

In this sense, we can see how kanban/JIT systems are countermeasures to external forces beyond the control of Toyota. Kanban is what they can control. By saying that these companies will "modify" their JIT/kanban systems demonstrates the misundestanding of these systems. It is not a fixed. Increasing the quantities in the kanban system is not the same as changing the rules that govern the system. Big difference. The rules still apply, the quantities only change. Another reason why people fail to see how kanban can apply in any organization at any time.
Read more »»  

Job Relations - New Archive Manuals and Materials at TWI Service Website

I just finished uploading the new Job Relations page at TWI Service. Check it out!

Also, I had nearly forgotten about the material I retrieved in the National Archives a couple of years ago, but stumbled across it last night. It is the material created by the original TWI Service so district representatives could convert their Job Instruction Manuals into a Job Instruction for Health care manuals. This is really interesting stuff.

Within the next week or so, I will upload the Red Cross files discovered at the files. This involves the work TWI did with the Red Cross and the only evidence that the so-called multiplier effect was a deliberate and effective plan that spread TWI like wild fire!

Bryan
Read more »»