Time Magazine covers Training Within Industry, Dooley, Dietz and Wartime Challenges

Read this article in Time's archives. Dated December 7, 1942.

http://www.time.com/time/magazine/article/0,9171,774056,00.htm


I especially like the part where the plant manager informs Dooley weeks later how Dooley's prediction of reducing time to train an expert inspector from 30 days to 1/2 day was wrong. It was only reduced to 1 day! The more things change, the more they stay the same, right?
Read more »»  

Is Lean a religion?

I've seen quite a few discussion forum posts on the Lean debate being compared to a debate on religion. Either you are a believer or you are not is one argument. The other typical argument is that there is common ground in the middle somewhere. A common criticism of this argument is that lean could be advanced much more quickly and effectively if the zealots would stop viewing lean as a religion. My take is this:

It sounds (and in a way it is) a religious argument because as many people will realize about lean, over time we are talking about a philosophy in leading an organization.

Encarta Dictionary: Philosophy

1) school of thought - a particular system of thought or doctrine

2) guiding or underlying principles - a set of basic principles or concepts underlying a particular sphere of knowledge

3) set of beliefs or aims - a precept, or set of precepts, beliefs, principles, or aims, underlying a person's practice or conduct.
There are many similarities between traditional manufacturing and lean manufacturing: each requires production control, sales and marketing, engineering, supervision, human resources and accounting. But the philosophy of HOW to do this while respecting people is drastically different; if not polar opposites. For this reason alone, it is not unreasonable to expect severe differences of opinion in how to run business. Because we hang on to our old habits, we fail at understanding the lean philosophy, and this is due to the cultural behaviors so prevalent in the discipline of U.S. management. When we do not understand, we will not try; when we do not try, we will not do it; when we do not do it, we will not understand. In lean, the concept of 'learning by doing' and experiential learning is so highly valued in the gemba.
A couple of the underlying disciplines in Lean/TPS are production engineering and manufacturing engineering. These two disciplines heavily influence the philosophy of TPS. In my experience, I can think of many examples where a manager of a department or company on the "lean journey" either:

a) doesn't understand any of these disciplines (or those which are related)

b) holds the traditional belief of these disciplines that work standards exist to enable command and control management, in other words - hold people accountable (U.S. speak for disciplining them when they do something wrong or make a mistake.)

In other words, in order for lean to be successful, it must be part of how a person conducts themselves as a manager. Traditional manufacturing in terms of production/manufacturing/industrial engineering does not hold the concept of employee involvement in high regard. This is a fundamentally fatal flaw of traditional western management yet is a core philosophical point that underlies lean management, or TPS.

Is my assessment far off the mark?
Read more »»  

New TWI Service Content � Program Development Training

Check out the new content page at TWI Service. The fourth and least discussed TWI program, Program Development is this week�s feature content. Take a look and see how the TWI Directors used PD to develop leadership among U.S. managers.

Bryan
Read more »»  

Lean Kaizen Teian TWI Survey

A question was posed on a popular lean forum this past week: "why do we have trouble sustaining lean in the U.S.?" Without question, the answers are numerous and all over the board. My basic belief is that any inititative that we want to stick requires a change in habits. But we cannot expect people to change if we don't change our own habits first.

The Kaizen Teian system is probably the most long standing successful program to do that in the factory environment. This blog deals with this topic to a large degree since I feel that everyone should be involved with the change. TWI is the only program I know of that in the past 100 years can be compared to the Kaizen Teian system, and is arguably the precursor the japanese kaizen teian system itself. See my content site with public domain materials and my commentary and judge for yourself.

At any rate, I'm curious what do you think of the modern suggestion system, Kaizen Teian, and how it would work in the United States? See the poll on the front page of the TWI blog and be heard!
Read more »»  

Toyota Culture Book Review I

I'm reading the new Liker and Hoseus book, Toyota Culture. Essentially this book is about how Toyota has taken the unique human systems (human value stream, if you will) painstakingly developed in Toyota Japan and transferred it into a very different Western culture. In short it requires change. If you are a leader and in particular an HR manager wondering, "how do I fit in with this lean thing?", you need to get your hands on this book. As I poke through this book a number of things jump out at me that scream TWI:

Page 25 - �Perhaps because of the profound influence of Sakichi Toyoda, who believed in contributing to group and society, but was also a brilliant inventor, Toyota seems to stand out in placing a high value on both group and individual achievements.�

Since TWI trainers encourage people to establish and improve their own work standards , it is not surprising to see the perfect fit with Toyota�s philosophy of valuing people and their ideas. The missing element in western society seems to be getting individuals to look past the individual rewards and recognize the benefits to the group. Perhaps we make too much hay out of encouraging the line operator to see the �big picture� and don�t balance the emphasis we make on individual and group benefit when an improvement is made? Perhaps we should take a smaller step, not overwhelm the person and encourage them to see the �medium picture� for her team? This seems to be the general approach that Toyota has taken within the gemba: a team leader, who sees the slightly bigger picture above, is able to paint the picture for the team within the scope of that team�s work. Is this the way Toyota deploys the �top-down, bottom-up� management system? Funneling and filtering the big picture down into meaningful chunks of information for the person doing the work in the gemba?
Read more »»