Elimination of Waste - 5S and Pull Systems in 1918

I've finished reading Installing Efficiency Methods, Knoeppel. This was published in 1918. Another post on the TWI blog highlights what may be the earliest description of a pull system.

Knoeppel describes in detail the "how-to" in implementing an efficiency and improvement program. But he goes beyond that delving into much of the change management problems Lean professionals face today. Among many other detailed steps that management staff should take, Knoeppel includes a recommended section that he says should be given to each employee.

" The success of the Company depends upon the success of each one employed by it. The success of each one depends upon the success of the Company. Our interests are therefore mutual and can receive proper attention only through co-operation.


We are undertaking the task of increasing the efficiency of out plant. By this we do not mean speeding up and driving our workers. We mean that we want to eliminate waste, whether in the form of time, energy, or materials. Our aim is not to stimulate strenuousness, for this is not efficiency.


Strenuousness means work harder and produce more. Efficiency, on the contrary, means work less hard and produce more. As an example: If you have to walk six feet to the supply of material, you can walk twice as fast and produce more through strenuousness. If, however, conditions are improved and the supply placed three feet away, you can accomplish more through efficiency, without the expenditure of additional energy.


You want steady employment at as high wages as you can get. We want as high a production at as low a cost as is possible. This condition can be brought about if we will work together in the manner that will be indicated to us by a careful and constructive investigation of the details of the business.


What we want to do is to eliminate:


  1. Waste due to faulty planning of work.
  2. Waste due to inefficient shop conditions.
  3. Lost motion in the operations themselves.

Perhaps you do not get material as you should: you are delayed through no fault of your own; machines may not be working as they should; tools supplied you may mean unnecessary work, with the result that you cannot do yourself justice.


Our efforts will first be directed towards improving the planning of the details in connection with production. In theory, we will follow the same method as is used by a railroad company in scheduling and dispatching its freight and passenger trains. In practice, it will mean working on the right thing, in the right way, at the right time. This you can see will mean better deliveries, satisfied customers, less rush and hustle in the factory, better working conditions, plenty of work, and, as a result, you will share in the success that will naturally follow.


You can assist us to a greater degree than you imagine. Look about you. Study what you are doing. Do you see a better way to do things? Can you suggest an improvement anywhere? Remember it is the little things which count, so do not hold back because the matter seems to small to talk about.


Remember this also. We want to force of well-paid, satisfied, willing and progressive workers. All we ask is that you give those assigned the task of studying our business your support and co-operation. They will help us find waste and inefficiency and assist you in eliminating it."

You could post this today in your plant and put across the same message we want withLean: elimination of waste. In one employee notice, Knoeppel touches on flow, 5S and Kaizen nearly 100 years ago.
Read more »»  

5S Required in Preparing for TWI Job Instruction

There are four "get ready" points when tackling problems with job Instruction Program...and 5S is a big part of the answer. Read on for my lessons learned...

The four get ready points are:
  1. Make a timetable
  2. Breakdown the job
  3. Have everything ready - the right tools, equipment, supplies and material
  4. Have everything properly arranged - just as the worker will be expected to keep it
In the Job Instruction program, participants learn about "how to make a timetable" by planning the training matrix and "how to breakdown the job" by writing a Job Breakdown Sheet. This covers the first two get ready points quite well. But what about the other two? Is it enough to simply tell the participants: "have everything ready and arranged"?

The simple answer is "no", it is not enough. In fact, I may be the first to tell you from experience that without these two get ready points fully thought through and acted on, your Job Instruction program is likely to fall flat on its face.

What does it mean to "have everything ready"? I learned the hard way on this one. On one particular job instruction target, we did all of our homework: good communication, everyone involved, all JBS were written and vetted, tools were in place, areas were cleaned up and organized, timetables in place. Once we had commenced training however, the problems began to set in.

What I have learned is that 5S goes beyond just tidying up the work area. Most of us know that 5S thinking is the key to a successful 5S program. What this means is questioning things like equipment and materials. For example: "do I have the right materials in place, in the right quantities?" By applying this first level of 5S thinking (stratification) to materials we can come to a conclusion about those materials state of "readiness". We can then find problems that prevent us from having a stable process in the first place. This is where Job Instruction fails and shines.

Job Instruction programs will fail if we fail to embrace 5S thinking. If we accept defective parts co-mingling in our raw materials, how should we expect our training to go? As planned? Hardly so. In fact, this is often the reason why many people say jobs can't be standardized. Because we don't question the thousands of details and problems at a basic 5S level, we often accept them as givens, therefore, our training must account for all of these variables. Bad materials, material shortages, or too many materials causing excessive handling all contribute to non-standardized processes that inhibit our ability to produce standardized training. The same can be said for equipment. Machine stops are not standardized, yet the occur and we accept them. Is this part of the standard training? No. Is the machine ready? No. In this sense, embracing TPM thinking and encouraging that behavior is an excellent way to "prepare for instruction". If we want a standardized, trouble-free process that is illustrated through world class hassle free training, then 5S and TPM is part of the JI preparation process.

This of course helps us highlight the problem of non-standardization itself. When we write a Job Breakdown Sheet, a well trained Lean practitioner can see these process problems. This is why JI is often used in Kaizen style sessions, where one Job Breakdown Sheet may produce one dozen Kaizen improvement opportunities. By implementing the solutions, the job can then be standardized.

Getting these improvements in place, seeing that they work and ensuring that the new standard doesn't backslide requires enormous effort. This back to basics approach also needs a systematic vehicle to ensure that it's use is reinforced everyday. This is why 5S, JI and other simple continuous improvement skills are best utilized in the hands of well training supervisors. It is also why a JI follow up guide and session was planned as time went on: people using the system realized that their people required ongoing leadership for any continuous improvement program.

These TWI WWII guys were way ahead of their time! Or are we just way behind?!
Read more »»  

Waste of Transportation

See link to Assembly Mag article: AGV vs. Conveyor.

This is a good, short article, outlining the pros and cons of each system. But, in the context of lean, which this aritcle was presented as...it misses the point. Well, one thing was true about this article, there is "no right answer" when it comes to choosing how to move material in your plant.

But, whether you pick AGV, conveyors, fork trucks or whatever...the main goal is to eliminate moves or minimize to the best of your ability.

Someday, I'm going to invent industrial levitation...
Read more »»  

Training Blog at Microsoft - Keypoints for Service Training

My TWI alert posted the following weblog link at Microsoft's website.

Tips for on the job training

I like some of the key points made in this post, particularly from the viewpoint of a person in the service industry.

1) "Simply telling customers you care isn't enough" is a major lesson learned in Job Instruction training when discussing different training styles, "telling alone is not enough" and is reminiscent of the JI motto:

"If the person hasn't learned the instructor hasn't taught."


2) "When starting a training program, the in-house trainer, the HR personnel, the supervisor or whoever is tasked to conduct the training, should first ask a simple, basic question, "How do I build an open relationship with the new employee?"

This is interesting to me. First, I like that the author calls out many different roles in a business that are responsible for training. Training should never be left to only training professionals, or the old shop hand. Any time we direct the work of other people, we should consider that moment a training opportunity and act accordingly.

However, I find the last question is misplaced. This question may be similar to asking, "How do I create a culture?" This line of thinking suggests that open relationships and progressive cultures are the objective when training others. However, we all know that simply engaging in the act of training doesn't mean good things are happening. What happens if the training is bad? The likely result is that open relationships are not created.

I'm not sure that asking the relationship question is the "right" question we are seeking to answer when pursuing training perfection. Rather, we learn in JI that the right behaviors we are looking for in training are more likely found when we think about training as means to solving a problem. In this way, a result of good training may be improved communication which in turn will ultimately meet customer needs. This in fact, is the final problem: "how to meet customer needs?" When we think of it this way, the question asked by the blog author is stuck somewhere in the middle of a causal chain. Good communication amongst employees is just one of the many benefits resulting from training. In this way, we can think of the ultimate aim of training is to solve nearly any problem for the sake of the customer. This is what we talk about when trying to balance customer, company and colleague needs.

3)"Learning is the Objective" This of course, the author nails, yet many still fail to see learning as one of the main objectives in any business model.
Read more »»  

National Foremen's Institute

Does anyone know whatever happened to the National Foremen's Institute? Perhaps it is obsolete? Perhaps it has changed name over the past half century?

Any ideas?
Read more »»