Leansters always say to NEVER lay off people as a result of improvements. The article predictably dances around this dogma - you may be wanting a nice, clean and tidy explanation of why Lean should never lead to layoffs, but you won't find it here:

"In the short term, as manufacturers slash inventories and reduce their workforces, the recovery could be slowed or delayed, experts say. Many, such as Sealy, are scaling back through attrition and cutting temporary staff rather than resorting to layoffs.

Yet industry wide, some jobs will be lost permanently as manufacturers use their new cost efficiencies to wring more output from fewer employees, says Cliff Waldman, an economist at the Manufacturers Alliance, which does research for the industry. But by allowing U.S. manufacturers to better compete against low-cost rivals abroad, the maneuvers are helping them maintain profits and ultimately hire employees, economists say."

"It's survival," Waldman goes on to say, "Our response to the cost pressures brought about by globalization is � to produce cheaper and more efficiently."

And the magic metric responds accordingly:

"'manufacturing productivity, or output per labor hour, rose 4.9% in the second quarter, the highest since early 2005', traced to lean-manufacturing techniques."

So what is good for Wall St. (productivity) is not so good for Main St. (loss of jobs). This was probably one of the more favorable Lean articles, but like many before it, the message is conflicted...but shouldn't it be? I predict that you may see some critical reviews of this article on the lean blogging posts today...defender's of the lean principles telling all of us how the rest of the world doesn't understand lean.

We are all learning, so be careful about seeking the Perfect Cinderella Lean Story...that may signal the end of the journey. Toyota's story is full of conflict, contradictions and put simply - problems. Their story is far from perfect and yet it continues. So why should we expect something different for our situation?

Read more »»  

Connect the Lean Dots

I love this photo. This was seen in the genba and can serve as a 5S Learning Lab. It helps us imagine many benefits of practicing lean if we only embrace problems.

How would 5S make this area ready for work? Tools would be easier to retrieve, perhaps even at the point of use. This would free up space on the shelf, perhaps to create a visual kanban system for the rebuilt units.

More space would also give us an opportunity to re- layout the work area, reducing motion, twisting, lifting, walking and stretching.

This type of problem awareness might allow us to see potential problems, like the refrigerator on top of the cabinet. Is this a hard hat area?

Do we need to open the cabinet to know the inside condition? When we talk about "shine", are we thinking about housekeeping, or do we see shine as an action: "cleaning to inspect?" If we remove the doors from the cabinet and made frequent genba walks in this area, do you expect this level of visuality would help us identify and embrace problems more easily?

Assuming we made some 5S improvements in this area, what other Lean benefits could we expect? Would jobs be easier? Faster? Of higher quality? Perhaps. It is also possible that training could be done more easily, thoroughly and of higher quality. This may also lead to safer, easier, faster and higher quality jobs.

There are many small kaizen opportunities here that will help people connect the dots and see the benefits of continuous improvement through the simple act of 5S. Are you helping them see?
Read more »»  

Problems Don't Have a Conscience

I've been learning a lot this month. The past several weeks have been a whirlwind of leading managers and their people in the skill of genba observation in 10 different North American manufacturing plants. Today, I learned that problems don't have a conscience.

Here is the situation. The HMI panel failed, so the engineer put a temporary solution in place. You can see the situation below:


What do you see? The display is resting on the air conditioner. The mouse is not on a mouse pad. Where is the keyboard? Do you see it? There are all types of violations of commonly accepted RULES here: falling hazards, ergonomic hazards, etc.

When I asked the engineer, "What do you see here?", he instantly went on the defensive. I can understand why, I have been stuck in this type of situation as well.

His breathless response was that it was a temporary solution and that the replacement HMI was coming in a few weeks. I smiled and thanked him for his honesty about the situation and his urgency in taking care of the broken HMI.

Then I asked him: "Do problems care if they are temporary or permanent?"

He appreciated the insight. "No, you are right. We are the only ones who care if problems are temporary." During the wrap up summary, he stood up in front of more than fifty people and shared this story with them. I have no doubt that he has improved the way he thinks about problems.

Do problems care if they are temporary in your plant?
Read more »»  

Building up Standard Work Using Job Instruction

submit to reddit
In response to this post back in May, Dan said...

"Hey Bryan: Congratulations on being a dad and glad you're recovering from your hospital "adventure." When you get a chance, could you please elaborate on point #4? I'm curious about what you discuss in regard to standard work and also what you mean by "I also change the methods used in how to achieve standard work." I've studied the section on standard work on the TWI website, but I'm still not sure where you're coming from on this point. Standard work is something my company always struggles with and any help I can get to make the JI-Std. Work connection more clear would be appreciated."

I'd be happy to Dan. First we have to think about what we are seeing in front of us with Job Instruction. We have a four step method, a Job Breakdown Sheet and a Time Table for planning the training and meeting the needs of the business. What we don't understand is that these forms are the result of a lot of planning and many years of practice. To sum up this first point, there is a lot to learn beyond the 10 hr session that we aren't seeing.

So to be clear, I'm still working out the kinks on how this is all working towards achieving standard work. But I'll explain what I've learned so far.

Next, let's understand what is a Job Breakdown Sheet (JBS) and what is Standard Work (SW). First, a JBS is a reminder for the trainer to put over keypoints to a trainee while using the four step method to instruct. If you missed that part, that's o.k. Go to a 10 hr JI session and you will be up to speed! SW is typically known as three components: 1) takt time, 2) work sequence and 3) standard wip. If you know what takt time and standard wip are, great. If you are really using those concepts in your plant, I'd like a tour sometime.

The SW work sequence is what we are interested in here. On a SW combination sheet which is what most people associate as the form Toyota uses for SW, you will see a list of tasks down the left hand side of the sheet. Each one of these tasks could be a potential JBS.

Now, why is this important, you are probably asking? Because the nature of pull systems is such that hiccups in material flow will disrupt things, we have got to be fully committed to minimizing variability. If you are, then you will know that sometimes people don't do things the same way. JI is a good way to minimize that variability, maintain the standard wip and meet takt time.

So, most people will say that JI is the missing link to th Toyota SW model. What they mean is that JI is standard work, but that isn't really true. JI is critical skill that supports SW in that training is used as a countermeasure against variability.

Now, JI trainers do have a point. JI is a great way to get people who do the same job to get on the same page about how to do that job. My modification to the JI program will be that perhaps we bring in a group of mechanics and we have them rebuild a component or a pump. Each one will observe the other and try to write a breakdown sheet. Mind you, this is happening only after the group has gone through the first three JI sessions. This exercise of genba observation usually reveals the following results:

Joe - 5 steps
Randy - 8 steps
Lisa - 6 steps
Chris - 7 steps
Larry - 7 steps
Michel - 5 steps

I don't have to say a thing to convince them that they should "standardize" the task by using Job Instruction. But the different steps isn't really what convinces them, it is the observations that they make while trying to capture keypoints that wakes them up. The reason for this is that keypoints represent the largest percentage of those tribal knowledge elements that everyone claims is "their way" or "I don't do it like that!" When people see others doing the job better or worse than they do, they become very cooperative because they realize that either way, this situation is a problem for them. In short, the experience opens their eyes to problems that affect them personally.

This technique works on just about any group I've used it with. Finance, mechanics, assemblers, injection molding operators, packers, etc. It doesn't really matter. This technique was not detailed in the original manuals, but I find it very useful for tackling several issues as a team:

- excessive quality problems coming from a group
- no training system in place, but new hires are coming
- supporting changes made in a kaizen event

It doesn't work if you just let people fill out the JBS. You must have them go through the sessions in order for them to pick up the skill, the rest kind of takes care of itself as long as you use the standard JI follow-up methods on the progress and check results.

In fact, this is the standard work cycle that many companies are missing today. Finally, JI is a way to close the loop on the standardize/plan-do-check-act cycle. The photo below more or less sums up what the ideal state (at least what many think is the ideal state) might look like:

Job Instruction cycle of Standardized Work

If you click on the image, it might look a little grainy. It is a hi-res image. Use your browser to zoom to the appropriate viewing resolution. I use the hotkeys ctrl++ or ctrl-- to bring web graphics to the right zoom level.
Read more »»  

Job Instruction and 5S

Last week, I was in a location that implemented a Job Instruction program in the laboratory. We were actually there for an assessment, but often, the conversation came back to Job Instruction. Why? Because the Job Breakdown Sheet (JBS) captures the current known standard and when you are making a judgment, you need a known standard to hold that judgment against.

For example, during the 5S assessment, we were talking about some documentation, manuals, papers, etc. that were well organized. Since a good standard was in place, the conversation gradual moved towards what the next improvement might be. Our judgment then, was that the area had good standards, but needed to move to the next level of organization and improvement. A question arose about point-of-use storage of his equipment manuals.

As we talked the problem through, the lab tech said this: �Look, I want to put all of these manuals together in one location away from the workstation because I don�t use them unless there is a failure. But with 5S we are taught to use point-of-use. I don�t use the manuals to do the job. That is captured on my JBS. So, if I move the manuals to a central location, I can decentralize the things I need, supplies for example � and move those things I really need to the point of use.�

When asked how he came to this conclusion, he offered a surprising answer:

�When I�m training a person using the JBS, I know I need the supply, but because I don�t have a spot for it, I have to go and retrieve it during the middle of training. It should be right here where we use it every time we do the job. Isn�t that a better utilization of the space?�

I couldn�t agree more!

There are two �Get Ready� points in Job Instruction that are not covered in a standard 10 hr session. The first is Get Ready Point #3:

�Get Everything Ready in the Area. Do you have the right equipment, materials, supplies, tools and information?�

Sounds like the basic 1S level of Sorting. Are we able to determine what is needed? Do we determine usage of materials? Is the information we need complete and accurate? These are good 1S sorting level questions to ask.

The second Get Ready point that is not covered in a standard JI session is #4:

�Have the workplace properly organized and standardized. Just the way the person will be expected to operate and maintain it.�

Sound familiar? 5S overlaps so many things. This Get Ready point brings us further into the 5S world, making us consider the 2, 3 and 4S levels. But what we were experiencing in this assessment however, was someone operating within an element of the 5S level: continuous improvement and standardization of the solutions. After all, we are told in Ohno�s Workplace Management that the real meaning of the 5th S: �sustain�, really means to teach. In the context of lean, we are looking to teach self discipline and improvement.

The Job Breakdown Sheet plays a critical role in all of this: a snapshot of the standard. More critical however, is the self discipline to maintain those standards and to open our eyes to waste that violates our own rules. It requires enormous amounts of energy for everyone in the organization to motivate themselves to do this. The most important part of the JI/5S equation is that management assumes a leadership role to learn and then teach the critical skills of seeing waste, problem solving and standardization. The last part of the puzzle is to follow up in order to motivate people on an ongoing basis to constantly be practicing these simple skills.
Read more »»